In Ca Mau province, Vietnam, the Wind Power Plant Project faced an unexpected challenge when a construction barge inadvertently damaged a vital 35kV cable during piling operations, leading to a significant power outage. Recognizing the urgency of the situation, CMC, the project owner, immediately engaged OEI.
Leveraging our expertise, we promptly conducted a thorough underwater survey to locate the damage. Once identified, we sourced the necessary joint materials and expertly fabricated the joint. Our specialized diving team, equipped with a dedicated barge, was then mobilized to retrieve and repair the damaged cable segment.
The post-repair process involved securely burying the cable at a depth of 2 meters to prevent future disturbances. This swift and efficient intervention by OEI in January 2022 ensured the uninterrupted operation of the Wind Power Plant Project, reinforcing our commitment to delivering timely and effective solutions.

Provision of Towage, Storage, and Maintenance Services for VETAG 8 - Pontoon Cable Laying Barge for Van Oord Offshore Wind B.V

Seabed Restoration at Thien Ung Wellhead Platform- VSP

Greater Changhua Offshore Windfarm Project

Provision of Equipment and Operator for Cable Burial (MMA Offshore Ltd.)

Zhong Neng Offshore Wind Power Project

Port Cranes Transportation Project

Binh Dai Mattress Installation at Landfall Project

Binh Dai Mattress Installation at WTG Project

Ca Mau Wind Farm Project - Subsea Cable Repair

Ben Tre VPL Wind Farm Project

Tra Vinh 1-3 Nearshore Wind Farm Project

Ia Bang 1 Onshore Wind Farm Project

Soc Trang Wind Farm – Onshore Cable Repair Project

HRSG Modules Transportation Project
OEI secured the contract to transport four modules for the FLNG Project located at the AlphaECC Yard in Vietnam. The responsibilities encompassed the loadout and transportation from Dong Xuyen Port, Vung Tau to PVshipyard port, also in Vung Tau.

CHERVON THAILAND – DECOMMISSIONING CAMPAIGN

75 MW Tan Thuan Windfarm
lorem

Provision of Towage, Storage, and Maintenance Services for VETAG 8 - Pontoon Cable Laying Barge for Van Oord Offshore Wind B.V

Seabed Restoration at Thien Ung Wellhead Platform- VSP

Greater Changhua Offshore Windfarm Project

Provision of Equipment and Operator for Cable Burial (MMA Offshore Ltd.)

Zhong Neng Offshore Wind Power Project

Port Cranes Transportation Project

Binh Dai Mattress Installation at Landfall Project

Binh Dai Mattress Installation at WTG Project

Ca Mau Wind Farm Project - Subsea Cable Repair

Ben Tre VPL Wind Farm Project

Tra Vinh 1-3 Nearshore Wind Farm Project

Ia Bang 1 Onshore Wind Farm Project

Soc Trang Wind Farm – Onshore Cable Repair Project

HRSG Modules Transportation Project
OEI secured the contract to transport four modules for the FLNG Project located at the AlphaECC Yard in Vietnam. The responsibilities encompassed the loadout and transportation from Dong Xuyen Port, Vung Tau to PVshipyard port, also in Vung Tau.

CHERVON THAILAND – DECOMMISSIONING CAMPAIGN

75 MW Tan Thuan Windfarm
lorem

Provision of Towage, Storage, and Maintenance Services for VETAG 8 - Pontoon Cable Laying Barge for Van Oord Offshore Wind B.V

Seabed Restoration at Thien Ung Wellhead Platform- VSP

Greater Changhua Offshore Windfarm Project

Provision of Equipment and Operator for Cable Burial (MMA Offshore Ltd.)

Zhong Neng Offshore Wind Power Project

Port Cranes Transportation Project

Binh Dai Mattress Installation at Landfall Project

Binh Dai Mattress Installation at WTG Project

Ca Mau Wind Farm Project - Subsea Cable Repair

Ben Tre VPL Wind Farm Project

Tra Vinh 1-3 Nearshore Wind Farm Project

Ia Bang 1 Onshore Wind Farm Project

Soc Trang Wind Farm – Onshore Cable Repair Project

HRSG Modules Transportation Project
OEI secured the contract to transport four modules for the FLNG Project located at the AlphaECC Yard in Vietnam. The responsibilities encompassed the loadout and transportation from Dong Xuyen Port, Vung Tau to PVshipyard port, also in Vung Tau.

CHERVON THAILAND – DECOMMISSIONING CAMPAIGN

75 MW Tan Thuan Windfarm
lorem

Looking to collaborate, inquire, or share insights? At OEI, we're always open to conversations. Don't hesitate to get in touch, no matter where you are on our site. We're eager to hear from you!
See more